Technical specifications
NIPA® panel data sheet.
Dimensions, coverage, installation criteria and ordering data, in the order a specification submittal asks for them.
Scope
What this page resolves.
The values below are the ones needed to take off material, define the secondary structure and write the roofing item. They are grouped in four blocks: performance, dimensions, coverage and ordering.
For the weight per m² of the full assembly with your batten layout, and for signed test documentation, write to us: both are delivered the same business day.
01
Performance
- Fire rating
- Class A (ASTM E108)
- Certified wind
- 260 km/h
- UV exposure
- 6,000 h (ASTM G155)
- Warranty
- 20 years
- Material
- Engineered polymer
02
Dimensions
- Length
- 93 cm
- Width
- 70 cm
- Thickness
- ≈ 1.0 mm
- Recommended exposure
- 22 cm
03
Coverage
- Installed at 22 cm
- 0.186 m²
- Minimum side lap
- 5 cm
- Minimum pitch
- 18°
- Fixings per panel
- 7
- Take-off waste
- 10%
04
Ordering
- m² per box
- 11
- m² per pallet
- 370
- 20 ft container
- 3,000 m²
- 40 ft container
- 6,000 m²
Take-off
From roof area to boxes on the order.
- 01
True area, not projected
Measure the sloped area of each plane. The plan projection underestimates material in direct proportion to the pitch.
- 02
Divide by coverage
Total area divided by 0.186 m² of installed coverage per panel at 22 cm exposure.
- 03
Waste
Add 10%, concentrated at valleys, junctions and edge terminations.
- 04
Close to order units
Round the result to 11 m² boxes; above 370 m² it is worth closing by pallet.
Installation criteria
Eight rules that define the finish.
They are the same ones covered in crew training. They are here so they can go into the project's written specification.
- 01Verify that the pitch of the plane is 18° or greater before installing battens.
- 02Set battens square, with constant spacing derived from the 22 cm exposure.
- 03Start at the eave and work towards the ridge, never the other way round.
- 04Keep a minimum 5 cm side lap between adjacent panels in the same course.
- 05Fix with seven points per panel, distributed as shown in the installation guide.
- 06Check the line with a string every few courses and correct drift immediately.
- 07Resolve junctions with hard construction using metal flashing, installed before the ridge is closed.
- 08Close ridges and hips last, with a continuous piece and the lap running with the water.
Request the signed data sheet and a physical sample.